<< 2012 Gallery

lhwsa logo

2017 Gallery >>


LHWSA Raft Inspection 11th Feb 2016

raft2016_00.jpg
raft2016_00.jpg
173 KB
raft2016_01.jpg
raft2016_01.jpg
161 KB
raft2016_02.jpg
raft2016_02.jpg
143 KB

LHWSA Raft Cleanup 25th March 2016

raft2016_03.jpg
raft2016_03.jpg
89 KB
raft2016_04.jpg
raft2016_04.jpg
146 KB
raft2016_05.jpg
raft2016_05.jpg
123 KB
raft2016_06.jpg
raft2016_06.jpg
134 KB
raft2016_07.jpg
raft2016_07.jpg
110 KB
raft2016_08.jpg
raft2016_08.jpg
133 KB
raft2016_09.jpg
raft2016_09.jpg
104 KB
raft2016_10.jpg
raft2016_10.jpg
85 KB

LHWSA Raft Inspection After Storm Katie 2nd April 2016

Edward took these pictures around 09:00. The raft has dragged both moorings.
The measured depth on the shallow side was only 1.7 metres when the tide was about 3.3 above chart datum.

raft2016_11.jpg
raft2016_11.jpg
95 KB
raft2016_12.jpg
raft2016_12.jpg
82 KB
raft2016_13.jpg
raft2016_13.jpg
81 KB
raft2016_14.jpg
raft2016_14.jpg
92 KB
raft2016_15.jpg
raft2016_15.jpg
77 KB
raft2016_16.jpg
raft2016_16.jpg
82 KB
raft2016_17.jpg
raft2016_17.jpg
81 KB
raft2016_18.jpg
raft2016_18.jpg
86 KB

LHWSA Raft Inspection At Low Water 8th April 2016

Edward and I took a trip down at low water around 18:00.

raft2016_19.jpg
raft2016_19.jpg
73 KB
raft2016_20.jpg
raft2016_20.jpg
83 KB
raft2016_21.jpg
raft2016_21.jpg
212 KB
raft2016_22.jpg
raft2016_22.jpg
180 KB
raft2016_23.jpg
raft2016_23.jpg
184 KB
raft2016_24.jpg
raft2016_24.jpg
173 KB
raft2016_25.jpg
raft2016_25.jpg
108 KB
raft2016_26.jpg
raft2016_26.jpg
73 KB

LHWSA Raft Mooring Sinker Inspection 1st May 2016

Some photos of the eyes in our two mooring sinkers.
First two of the north sinker and the second pair of the south sinker.
To give a sense of scale, the attached rope as just under 1 inch in diameter.

raft2016_27.jpg
raft2016_27.jpg
103 KB
raft2016_28.jpg
raft2016_28.jpg
85 KB
raft2016_29.jpg
raft2016_29.jpg
108 KB
raft2016_30.jpg
raft2016_30.jpg
91 KB

LHWSA Mooring Chains in the yard 21st June 2016

Some photos of the shackles and new 50 mm chain for the raft moorings.
To give a sense of scale, my computer bag is in the second shot, the big shackle weighs about 14 kg.

raft2016_31.jpg
raft2016_31.jpg
142 KB
raft2016_32.jpg
raft2016_32.jpg
155 KB

Laying New Heavy Chain Using the Delilah 30th June 2016

Couple of photos taken while laying the new 50mm chain for the raft moorings.

raft2016_33.jpg
raft2016_33.jpg
72 KB
raft2016_34.jpg
raft2016_34.jpg
92 KB

Lifting and moving old moorings 13th Aug 2016

Taken while lifting and moving the old mooring chains at the raft.

raft2016_35.jpg
raft2016_35.jpg
74 KB
raft2016_36.jpg
raft2016_36.jpg
66 KB
raft2016_37.jpg
raft2016_37.jpg
70 KB

Cutting off and replacing the tails 27th Aug 2016

Taken while replacing the old tails with new 20mm chain at the raft.

raft2016_38.jpg
raft2016_38.jpg
74 KB
raft2016_39.jpg
raft2016_39.jpg
66 KB
raft2016_40.jpg
raft2016_40.jpg
70 KB
raft2016_41.jpg
raft2016_41.jpg
70 KB

Moving the raft 11th Sept 2016

The patrol boat, John Easterling, towing the raft to its proper moorings.

raft2016_42.jpg
raft2016_42.jpg
89 KB
raft2016_43.jpg
raft2016_43.jpg
88 KB
raft2016_44.jpg
raft2016_44.mp4
2787 KB

Connecting the raft to its proper moorings 13th Sept 2016

Using the Delilah to reconnect the 20mm risers to the 50mm Heavy chain.

raft2016_45.jpg
raft2016_45.jpg
84 KB
raft2016_46.jpg
raft2016_46.jpg
63 KB
raft2016_47.jpg
raft2016_47.jpg
74 KB
raft2016_48.jpg
raft2016_48.jpg
96 KB

Created by IrfanView